Srinagar Leh Highway Status 2019 as of now is closed. Like previous years, this will remain to be a dedicated post for updating the status of Srinagar to Leh road and it’s condition in 2019. Along with this blog post, I will also be running a thread on the Community Forum Srinagar to Leh Road Status 2019 which I will recommend that you follow to receive the latest word on opening of the highway.
Srinagar to Leh Highway Status 2019: OPEN
Srinagar Sonamarg Road Status: OPEN
Leh to Kargil Road: OPEN
Kargil to Padum Road: OPEN
Update: June 17th
If planning to go from Srinagar to Leh, please keep in mind that from Sonamarg to Zojila top is a huge traffic jam. Same is the situation if you were coming from Leh side. Below is an update on the timings at Zojila.
- Srinagar – Sonamarg – Gumari Road: Vehicular movement shall be allowed both ways from Kargil towards Srinagar and vice versa.
- LMVs from 0500 hrs. to 0700 hrs and HMVs from 0700 hrs to 1000 hrs shall be allowed from Minimarg towards Srinagar
- LMVs from 1000 hrs. to 1200 hrs. & HMVs from 1200 hrs. to 1500 hrs. shall be allowed from Sonamarg towards Kargil
Update: April 28th
After a long wait, Srinagar Leh Highway was declared open for civilian traffic today. The road was thrown open by GOC 15 Corps Lt Gen J S Dhillon in an inaugural function held at zero point Zojila today by flagging off a convoy. The road was closed in December last year and due to heavy snow accumulation and snow avalanches, the reopening of the road got delayed by almost a month this year.
This will mark the official beginning of tourist season in Ladakh this year. A lot of people have eagerly been waiting for the road to open. Last year the highway got opened in March 1st week itself but this year, due to heavy snow on the road, the opening got delayed.
With that being said, I will strongly advise not traveling on the road for at least next 2 to 3 weeks. Please note that the highway was declared open on Friday itself but due to avalanches at 10 or 12 different places, BRO had to close it again. While the army convoys and locals were able to drive across Zojila today, it is not yet safe for tourists to ply on. There is also a huge chance that the road may get closed again for a couple of days for restoration work.
For recent updates on the opening of the road, please follow the forum thread Srinagar to Leh Road Status 2019
How to Plan a Journey on Srinagar Leh Highway
If you are thinking of a trip to Ladakh next year then I would request you to read through How to Plan a Trip to Leh Ladakh – Complete Travel Guide. In this article, I have covered in details almost every aspect of traveling to Ladakh. Reading this, you will have information on things you must carry; clothes you should pack; planning your itinerary; things you must see and where you can stay. Some of the other things that you must know and covered in the article above are on how to prepare your vehicle for the trip; how to handle acute mountain sickness in Ladakh; and what you should keep in mind while traveling with children and elders.
A few articles that will provide you information on Srinagar Leh highway are listed below. Go through these posts and prepare yourself for the trip as you wait for the road to open.
- Is Srinagar Leh Highway Safe for Tourists?
- Srinagar to Leh Route Guide and Road Map
- Why you should travel to Ladakh via Srinagar Leh Highway
- How to Travel from Srinagar to Leh
- Best Time to Travel from Srinagar to Leh by Road
- How to rent a motorcycle in Srinagar
- Srinagar to Leh Bus Service
- Srinagar to Leh Travel Time
- Guest Houses & Hotels on Srinagar Leh Highway
- ATMs, Mechanics & Petrol Pumps on Srinagar Leh Highway
- Tourist Attractions on Srinagar Leh Highway
Update: April 20th
Two ambulances from Kargil crossed over Zojila this morning and reached Sonamarg safely. The pass has been cleared of snow and assessment is currently being made about when to declare to for civilian traffic. The way the work has been progressing, it is hopeful that the road may get declared open by April 25th or by May 1st at most.
The road from Kargil to Padum (Zanskar) as well was declared open for vehicular traffic today. However, only light vehicles are being allowed as of now and it will be a few days before heavy motor vehicles will get allowed. There is still snow at Pensi La pass and road widening and restoration work is still under progress.
Srinagar Leh Highway Status 2019 – Update: Update: April 18th
The road from Srinagar to Sonamarg has been declared open for LMVs. For now, traffic on the Gagangeer-Sonamarg stretch is allowed from 11 am to 3 pm only. BRO is anticipating to reopen the Sonamarg – Leh stretch by May 1st week. Snow clearance work has been completed from both Sonamarg and Drass side up to zero point (Zojila). The work now continues to widen the road which should be completed in next week or so. After that, road conditions will be assessed before taking the decision about when to allow traffic on the road.
However, the recent and sudden change in weather may delay the widening work and push the opening date even further into May. Zojila has already experienced a fresh spell of snow and more is expected until April 20th. For now, do not plan traveling on the stretch any sooner than May 10th. Even if the road did get open before that, it will be very risky to travel on and may get closed anytime.
Another new development would be in form of the decision taken by the government to stop civil traffic movement on Jammu Srinagar highway every Wednesday and Sunday from 4 AM to 5 PM. This decision was made after the recent Pulwama attack. Until May 31st, 2 days of the week will be reserved for movement for military convoys and rest 5 days will be for civil traffic. Will it continue to remain this way after May 31st is not yet clear. If you are planning to travel from Jammu to Srinagar by road in near future, please plan your itinerary accordingly.
Srinagar Leh Highway Status 2019 – Update: Update: April 7th
The road from Srinagar to Sonamarg has been cleared of snow but is still not open for tourists. Official sources said that there are apprehensions of snow avalanches en route due to huge accumulation of snow due to which traffic movement is not yet allowed beyond Gagangir. It is only after proper assessment of the road conditions that tourists will be allowed to visit Sonamarg. As of now, erected barricades have been erected near Gagangir to stop any traffic movement on the road.
Srinagar Leh Highway Status 2019 – Update: March 24th
As per the (BRO) officials, The snow clearance operation on 12 kilometers road from Gagangeer to Sonamarg was completed on Sunday. The work was kick started in March 1st week and it took 3 weeks for BRO to get to Sonamarg because of heavy accumulation of snow this year. Traffic however has still not been allowed as there are still apprehensions of snow avalanches en route. The entire area has witnessed more snow this year as compared to previous years and proper assessment of the road conditions will be made next week before any traffic movement is allowed. Until then, Sonamarg will remain closed for both tourists and locals.
BRO will now start working towards clearing the snow from Zojila Top. Considering that it took 3 weeks to clear the 12 kilometers between Gagangeer and Sonamarg, it would probably be April end or early May before the road across Zojila is deemed as safe to travel for tourists.
Srinagar Leh Highway Status 2019 – Update: March 10th
Snow clearing work on Srinagar Leh highway was officially started last week. BRO is now working to first clear the snow on 12 kilometers long Gagangeer Sonamarg stretch and is hopeful to have it completed by the end of March. After reaching Sonamarg, work will then continue towards the Zojila pass to free its 30 kilometers long stretch of snow. The amount of snow this year is much greater as compared to previous ones. Around 6 to 7 feet of snow is accumulated on the ground between Gagangeer and Sonamarg.
Srinagar Leh Highway Status 2019 – Update: March 3rd
Last year at this time, the snow clearing operation on Srinagar Leh highway was in full swing and by 15th, the entire stretch was declared open for civilian traffic. On Manali Leh route too, the clearing operation started in early March itself and by April 1st week, the road was open for traffic.
Situation this year however is entirely different. It continues to snow heavily all over Himalayas and more snow is expected. Opening of all roads and passes this year will definitely get delayed. As of now, in terms of Srinagar Leh route, do not expected it to open any earlier than late April. Rohtang Pass will probably not open by Mid May and Manali Leh highway in early June. This however is just an estimate for now and can get changed as the weather progresses.
Even the opening of Sonamarg this year will not be before early April. Snow clearing operation on this stretch has not even started yet as the region is still experiencing snowfall.
Srinagar Leh Highway Status 2019 – Update: February 18th
The recent blast that killed 42 CRPF man has the entire valley and the country on edge right now. How it is going to affect the opening of the road and the tourist season is something that only time will tell. A curfew has been imposed in several places. If you were planning to visit Kashmir anytime soon, then I would strongly recommend that you put your plans on hold for a while; and wait for the tension to ease down.
Srinagar Leh Highway Status 2019 – Update: February 11th
The snow this year has been far too great than last few ones. The snowstorm in early Feb followed by incessant rains have made the matters worse. More snowfall is expected in coming week and throughout the month of February. There is already about 4 to 5 feet of snow in several places in Kashmir and Ladakh. Posting below a recent picture of Srinagar Leh highway at Fotula Top; shared by a friend of mine traveled from Leh to Kargil last week.
Srinagar Leh Highway Status 2019 – Update: February 4th
The road right now is only open till Gagangir. Snow this year has been way more than expected; and the snowfall still continues. Even Sonamarg was declared closed for tourists several weeks earlier than usual. The way the weather is trending right now, do not expect Srinagar Leh Highway to reopen any sooner than early May. Even Sonamarg right now is expected to remain closed well into April.
Srinagar Leh Highway Status 2019 – Update: December 9th
Sharing a recent picture of the highway near Sonamarg that I recently received from a friend.
Srinagar to Leh Opening Date 2019
The opening of the road entirely depends on the weather and how fast BRO is able to clear the snow after winter ends. Historically, mid April is a safe time to assume as the opening date of Srinagar Leh Highway. There have been instances though when it was opened early.
2018 is a great example when the entire stretch was free of snow; and open for traffic in as early as March. But as a tourist, I will not recommend planning a journey on the road any sooner than late April or early May. Even if the road was declared open before this, it will be in terrible condition. Allowing a few weeks after opening will give time for BRO to stabilize the road. You must keep in mind that in early days of opening, a temporary closure that can sometimes last a couple of days is common as BRO continues repair work on the road.
Srinagar Leh Highway Status 2019
An official announcement is yet to be made; but Srinagar Leh highway has remained closed for last 4 days after heavy snowfall at Sonamarg, Zoji La and Drass. It is highly unlikely that the road will now open for vehicular movement; but even if it does, it is too risky to be traveling on it now. Chances of weather closing in any minute and road getting blocked are high right now. Authorities may open the road for a few more days for locals or they may not; but as a tourist, you can safely assume that the road currently is off limits. It is only a matter of days before it is declared closed officially.
Conclusion
I hope the information above was of help. For latest updates on the highway, please look through the comments section on this page; or follow the community thread Srinagar to Leh Road Status 2019. If you have any questions; please feel free to comment and ask; and I will be glad to answer.
147 comments
Hi Vargis
Just wanted to clarify this…on the Srinagar to Sonamarg stretch the snow is not cleared at all in the winter until Gagangeer? Is that correct assumption.
Also is the road from Kullan to Gaganveer always open and snowplows clear any snow that might fall?
Thanks
Hi Dave – The road from Srinagar to Gagangeer remains open throughout the year. It is after Gagangeer that the traffic movement is stopped.
4×4 MANALI to LEH LADHAK
We have a bolero 4×4 going to Leh once the road is open, in the first days of june.
We are looking for 2 to 3 passengers. Cost 3.500 R each. First day we go to Darcha, last village in Lahoul. The next day we reach Leh. We have a safe driver who travels slowly and we can stop whenever.
We plan to stay a few days in Leh and then return to Manali. Return ticket only costs 1500 R. So 5000 R for both ways if you choose to return with us.
Call 8922033556 Or watsapp +502 35196689
We want to go ladakh through zojila pass last week of May or 1st week of June of2020.Which wiill be the right time?Is Zojila pass open through out the day?
… Thanks in advance
..Suparna from west bengali.
Yes it is open all day and the timing will be fine as well
Hello vargis ji. I am planning to going leh on 20 may by car. srinagar leh highway is safe at this time.
I mean crossing srinagar is safe
Yes it will be Yogendra Ji.
After a long wait, Srinagar Leh Highway was declared open for civilian traffic today. The road was thrown open by GOC 15 Corps Lt Gen J S Dhillon in an inaugural function held at zero point Zojila today by flagging off a convoy. The road was closed in December last year and due to heavy snow accumulation and snow avalanches, the reopening of the road got delayed by almost a month this year.
This will mark the official beginning of tourist season in Ladakh this year. A lot of people have eagerly been waiting for the road to open. Last year the highway got opened in March 1st week itself but this year, due to heavy snow on the road, the opening got delayed.
With that being said, I will strongly advise not traveling on the road for at least next 2 to 3 weeks. Please note that the highway was declared open on Friday itself but due to avalanches at 10 or 12 different places, BRO had to close it again. While the army convoys and locals were able to drive across Zojila today, it is not yet safe for tourists to ply on. There is also a huge chance that the road may get closed again for a couple of days for restoration work.
Thank you Khan Sir for the update. I have been following you since three months and this helped me a lot. Thank you once again
Thank you Sonia Ji
Hi Khan Sir. We are planning to go on bike on 10 may to Srinagar from Ladhak. Is it safe. Ya hum phas jayenge zozila pass me .Please guide me.
No it is safe to go. You will be fine
Hi Khan Sir. My trip to Ladakh and Srinagar was just fab, beautiful and breathtaking. Thanks to your updates. God bless you and have a nice day.
Hello Sonia Ji – I am glad that your trip went well. Please do share some information on the road condition and a few pictures if possible.
God Bless you and your family
Hi Khan Sir. We traveled on 10 may from Ladakh to Srinagar. Climate was good. Zozila pass had fresh snow fall. Mild Jam on the zozila pass as trucks were passing but the jam was only for five minutes. After zozila pass it started to rain and the rains still continued after we cross the sonmarg. But we really enjoyed the highway. It was a happy, enjoyable yet deadliest road ever I saw. Sorry khan Sir I have no pictures of the highway. But now one can bindhast go by road to Srinagar leh. No difficulties in travelling.
Thank you Sonia Ji. Really appreciate that information.
Thanku vargis Bhai..
We are comming
When are you planning Rameez Bhai?
1 may inshaallah…
Inshha Allah. Do update the condition of the road once you return Bhai
Hundereds of stranded passengers from Ladakh region protest in sonamarg due to closure of Srinagar -Leh National highway. As the highway has been opened once on 24th of April but due unfavorable climatic conditions it has been delayed till 27th of April.
Aajaz Bhai..
Zojila Update
*Zojila NH1 Officially open for traffic moment and inauguration function 26th April 2019 divisional commissioner kashmir*
❤
We are from kerala we plan to come srinagar on 1 May. And thereafter proceed towards leh by NH1. Now i have seen in this blog a comment from Rameez stating that the NH1 would be opened on 26 April 2019. Could you please confirm.? ?
#Sonamarg.. Hundereds of stranded passengers from Ladakh region protest in sonamarg due to closure of Srinagar -Leh National highway. As the highway has been opened once on 24th of April but due unfavorable climatic conditions it has been delayed till 27th of April.
Thanks Rameez Bhai
SABARINATHAN BHAIThe strategic 434km long Srinagar-Leh highway is likely to be reopened tomorrow (Sunday), insha Allah
official sources said on Saturday.
Thank you for the update Rameez Bhai
Thanks Rameez Bhai
Can any one tell me what is new update and what is the road condition right now
Vargis Bhai app ho yaha par koi new update hai ya nahi
May 1st week tak khulne ka andaza hai filhal Aajaz Bhai
Expected to open by May 1st week at latest.
Two ambulances from #Kargil,ladakh side crossed zojila this morning.
Ahmad Baqiria told over phone that road is very clear and its suitable for traffic movement….Now we are waiting what step and decision by our authorities regarding early permission.
INSHALLAH they will consider as soon as possible…
DC kargil,ladakh & SSP kargil,ladakh are also On the way to Zojela Pass As pur source..
Thank you for the update Rameez Bhai
It’s my pleasure vargis bhai..
Srinagar-Kargil-Leh National Highway #NH1D will be reopen on 25th April 2019 officially : SP Kargil
Hope so Abhijeet bahi..
Hi Khan Sir. Sorry to bother you again. I just wanted to know whether which network works in Ladakh and Srinagar . Also prepaid or postpaid. Also please advice me about it’s calling and internet connectivity . On the second hand family should be in contact. Waiting for your reply Sir.
Hello Sonia Ji – Please see the post below. This should answer all your questions about mobile network.
https://vargiskhan.com/log/mobile-network-in-leh-ladakh-2019/
Thank you very much Khan Sir . This helped a lot . Have a nice day ..
You are welcome Sonia Ji
I doubt it Abhijeet Bhai but let’s hope it does
Kb tak chala ghee sumo leh kho bhai ap kha sa ho
May 1st week ke baad hi chalegi Sonu Bhai
Fresh snowfall in zojila from last night..
Very sad news
It will push the opening date even further than May 1st week
S/w Bhai Jaan ek Baar clear kardijiye Sri…to leh road kab tak khulega
W/A Bhai — May 1st week hi maanke chaliye filhal
What’s new update of Sri…to leh roads
Road will open in 4 –
5 days
Sure..It will open before 20-22 March?
March bro its April..not march
If you mean 22nd April then the answer is no it won’t.
If you meant 22nd May then the answer is Yes it would.
#Sonamarg-Gumri road to reopen for traffic from April 15
Publish Date: 14-Apr-19 4:19 PM
The authorities on Sunday decided to re-open the Srinagar-Sonamarg-Gumri road for the vehicular movement from April 15.
“It notified for the information of the general public that the Srinagar-Sonamarg-Gumri (SSG) road upto Sonamarg resort shall be opened for vehicular traffic from April 15,” reads an order issued by deputy commissioner Ganderbal.
The official has said that the road shall remain open from 11 am to 3 pm only under the supervision of CEO SDA, SDM Kangan and SDPO Kangan and during fair weather conditions.
The road was closed in December last year due to heavy snowfall in the area.
Thanks for the update Rameez Bhai
Ur welcome vargis bhai..
Allah bless you
You too Rameez Bhai
Kargil Today Flash Kargil today
Curated By @drass.kargil
Photo File Pic.
*14-04-2019*
Project Vijay reached *Gumri* and Team Beacon Reached 2 KM From *India Gate* And will clear in next few days subject to weather,
Meanwhile 20 peoples Cross *Zojilla Pass* By foot this morning and reached safely at *Sonamarg*
Thanks for the update Abhijeet Bhai
A/w bhaijan khairiat hai Sri… To leh road 20 tak khulega kya umeed hai
W/A Samir Bhai – May 1st week tak hi khulega road maanke chaliye
Vargis bhai
Road lags tak clean ho gaya any updates
I mean Road Kaha tak Cleen ho gaya
Abhi toh Sonamarg bhi nahi khula Rameez Bhai.
Vargis Bhai Maine Suna hai ki 15th April Ko road open hoga kya ye such hai
Nahi Abhijeet Bhai … 25th se pehle nahi khulega
How much chances of having the road open on 26th April 2019.
High chance as of now
A/W vargis Bhai
April 20 take rasta open ho jayega bhai Sri to leh
W/A Aakhil Bhai – 25th April ki estimated date hai is waqt opening ki
Sir any new update
25th April is the estimated opening date as of now
Namaste Vargisbhai, How are you, Happy to contact you after long period. I want to visit LEH between 17/05/2019 to 24/05/2019 by Public Transport from Srinagar, Is Road Open and buses are available from Srinangr to Leh at that time. Also Pl. suggest tour programme for this period. We are 2 pax (Me and my Wife) Thanks a lot. Dilip Rajgurav-Pune MS
Hello Dilip Bhai – I am well, how have you been. Yes the road from Srinagar side will be open but if it is possible, I will recommend traveling in early June. That way, you can go via Srinagar and come back via Manali.
Vargis Bhai
A/W
I can go 19 April srinagar to leh by our car
Vargis Bhai plz reply
W/A Tausif Bhai – Hard to predict right now, depends on how fast BRO is able to clear the road
Hi Khan Sir. Is it safe to travel Ladakh to Srinagar by Bullet. Will there be any difficulties or snow. . We will be traveling on the 10 may.
Hello Sonia Ji – Yes it is safe to go. There could be some snow at Zojila top but that is pretty much about it.
Thank you Khan Sir…Have a nice day
You are welcome Sonia Ji
S/w bhai Jan main suna hu ki 15/20 April ko road khulega ye baat sach Hain kya aap aek Baar clear kardete to achha rahta
W/A Bhai . Andaza toh hai ke 15/20 tak khul jana chahiye par late bhi ho sakta hai ek do hafte aur.
As per the (BRO) officials, The snow clearance operation on 12 kilometers road from Gagangeer to Sonamarg was completed on Sunday. The work was kick started in March 1st week and it took 3 weeks for BRO to get to Sonamarg because of heavy accumulation of snow this year. Traffic however has still not been allowed as there are still apprehensions of snow avalanches en route. The entire area has witnessed more snow this year as compared to previous years and proper assessment of the road conditions will be made next week before any traffic movement is allowed. Until then, Sonamarg will remain closed for both tourists and locals.
BRO will now start working towards clearing the snow from Zojila Top. Considering that it took 3 weeks to clear the 12 kilometers between Gagangeer and Sonamarg, it would probably be April end or early May before the road across Zojila is deemed as safe to travel for tourists.
A/W
Vargis Bhai
Bhai 20 April tak Rasta declared ho jayega
Kuch chances hai Bhai
W/A Latif Bhai. Chance toh poora hai, ho jana chahiye Insha’Allah
Vargis bhai
Kitne date ko road open ho sakta hai srinagar leh
April end tak hi hoga Faizan Bhai
A/W vargis Bhai
I plan to trip by road srinagar to leh 15 April the road will open
W/A Aadil Bhai,
It probably won’t open before April end.
Live update vargis bhai
Estimated opening is still April end Rashid Bhai
Sir I have booked my flight tickets to Srinagar on 10 April and return tickets from leh on 19th April.will the road open to leh on 15th April ! And where will I get oxygen cylinder.any contact no please share with us .we are travelling with 8 members and one is 2.5 yrs old girl.is it ok with it.And what are the precautions to be taken while journey.Thank You
The road will not open by 10th April Mr. Khoda. Please either delay our trip or fly directly to Leh.
For Oxygen tank and about your daughter, please see the post below.
https://vargiskhan.com/log/rent-oxygen-cylinder-for-ladakh-trip/
https://vargiskhan.com/log/traveling-to-ladakh-with-children/
Live update Vargis Bhai
Srinagar to leh road
Open date
It will probably be open by Late April Asad Bhai
Hi bro, do you know if the roads from Leh to Nubra Valley, Pangong and Tso Moriri will be open by mid april? Also are there(and will there be?) any issues in Ladakh because of the recent India Pakistan tensions? Is it safe to travel to Leh in mid April?
Hi Mahesh – Yes the roads are all open even right now and no problem in terms of security as well. Take a look at the post below.
https://vargiskhan.com/log/plan-trip-ladakh-in-april/
Khan Sir your updates are really very helpful. Hope our trip will be in full enjoyment and thrill. Thank you one again for all the updates. May Allah bless you and keep you Happy always
Thank you so much for your kinds words Sonia. God Bless You and your family !!!
Hi bro, is bike renting allowed when there’s snow on the roads? Because I heard something like you’re not allowed permission to ride bikes to nubra valley, pangong, tso moriri etc. when there is snow on roads. Is this correct?
No such rule Mahesh. You are free to rent motorcycles anytime.
What’s chance of road Will open srinagar to leh
It will open in Late April or early May
Live update Vargis Bhai wats condition road srinagar leh
Snow clearing work is ongoing right now Ubaid Bhai
Can I go srinagar to leh by road 15 April
Can’t say right now
When will srinagar leh highway expexted to open in 2019
3rd week of April or after
Vargis bhai road kab tak open hoga
April Mid tak open Umair Bhai
Bhai us se pehle kuch nahi ho saktha hai
Usse pehle nahi khulega Abhijeet Bhai. Abhi toh barf gir rahi hai vahan, kaam shuru bhi nahi hua snow clearing ka
Ok Bhai ji thx for information ..
Keep update plz
You are welcome brother !!!
Last year at this time, the snow clearing operation on Srinagar Leh highway was in full swing and by 15th, the entire stretch was declared open for civilian traffic. On Manali Leh route too, the clearing operation started in early March itself and by April 1st week, the road was open for traffic.
Situation this year however is entirely different. It continues to snow heavily all over Himalayas and more snow is expected. Opening of all roads and passes this year will definitely get delayed. As of now, in terms of Srinagar Leh route, do not expected it to open any earlier than late April. Rohtang Pass will probably not open by Mid May and Manali Leh highway in early June. This however is just an estimate for now and can get changed as the weather progresses.
Even the opening of Sonamarg this year will not be before early April. Snow clearing operation on this stretch has not even started yet as the region is still experiencing snowfall.
Assalam alekum Khan bhai. I am planing a trip to kashmir in first week of april. sonmarg on 4th or 5th of april. to that time road will open or not? or in current situation its okay to visit kashmir or postpone the programe.
Walaikum As-Salam Bhai. It’s really tough that the road will open by then. It is still snowing in the hills.
Hi khan ji I am planing to travel by road 15 April srinagar to leh the road will condition on date
Hi Khan ji. I am planning for Ladakh trip on 4 may 2019 and on 9 may I will be travelling to Srinagar by road. Will the Leh Srinagar highway be open on first week of may.
Yes it should be open by then Sonia Ji
Sir thank you so much for your information
You are welcome !!!
Live updates srinagar to leh road vargis
No further updates as of now Masoom. It is still buried under snow.
Live update Vargis bhai
No further update right now Aarif Bhai. Pretty much the same situation as I last updated.
Plz live update news by srinagar to leh road good news
Hi…I am planning a trip to Leh in Sept 2019. Will i find snow during that time ? Thinking of getting flight upto Srinagar and rest of the journey through road. Please share your thoughts on this
You may find a little snow at top of the passes but not much.
Assla walekum Vargis Bhai the road can be declared In srinagar to leh first week of April any chances plz reply
Walaikum As Salam Naved Bhai – No it will not open by April 1st week this year.
See forum post for latest updates and pictures of Srinagar Leh highway.
http://roadragas.com/index.php?threads/srinagar-leh-highway-status-2019.4261/page-2
The snow this year has been far too great than last few ones. The snowstorm in early Feb followed by incessant rains have made the matters worse. More snowfall is expected in coming week and throughout the month of February. There is already about 4 to 5 feet of snow in several places in Kashmir and Ladakh.
Kab tak Sri… To leh roads khulegay Bhai Jan reply dijiye
May 1st week tak khulega Samir Bhai
The road can be declared last week march then any chances plz tell me because some work
It will definitely not open in March
HI, i have been reading this site, need to know status of Srinagar Leh highway open date i come to sirinagar by road 14 april and leh road are open
It depends on the weather. Hard to predict right now
HI, i have been reading this site, need to know status of Srinagar Leh highway open date to plan my holiday, i tried to sign up but not able to complete the page, its throwing up error. Kindly help
The divisional commissioner Kashmir Baseer Ahmad Khan has ordered the closure of Srinagar-Leh highway, connecting the Ladakh region with the Kashmir valley, from November 22, 2018, Thursday till further orders.
An order issued by the divisional commissioner reads: “In view of the report received from deputy commissioner Ganderbal on 21 November 2018 regarding bad weather and slippery condition of the road surface on Zojila, thereby endangering the life and property, it is hereby informed for information of general public that Srinagar-Sonamarg-Gumri (SSG) road Zojila Pass shall remain closed for all types of vehicular traffic with effect from 22nd of November 2018 till further orders.”
Hi vargis .I’m glad that I came across your post. Me and my friend have planned to come to Ladakh on our motorcycle all the way from Kerala during the month of april. Will follow your thread to keep myself updated. Love from Kerala .
Thanks Siddharth.
The Key to ur journey would be preparation. Mind, Body, Vehicle and attitude. Get in touch
Sam Kollam .
Thanks Sam